ISO 9001 CERTIFIED • 30+ COUNTRIES

High-Pressure Sand Flushing Unit
for Efficient Oilfield Well Cleanout

Engineered for Performance. Built for the Field. Trusted by Operators Worldwide. Restore production faster with our mobile, self-contained sand flushing equipment.

Watch How It Works
Tel/WhatsApp: +86 189 3767 6920
ISO 9001:2015 Certified
30+ Countries
20+ Years Experience
API Standards Compliant
OUR LEGACY

About Vance Petro — Your Trusted Partner in Oilfield Sand Removal Solutions

Henan Vance Petroleum Machinery Co., Ltd. (Vance Petro) is a professional oilfield equipment manufacturer headquartered in Puyang City, Henan Province, China — the heart of China's petroleum machinery industry.

With over two decades of engineering experience in the oil and gas sector, Vance Petro has earned a reputation for delivering high-quality, field-proven equipment to operators across the globe.

Our flagship sand flushing unit is designed, manufactured, and tested under our ISO 9001:2015 certified quality management system, ensuring consistent performance in the harshest environments.

30+ Countries
Global Deployments
20+ Years
Petroleum Machinery Expertise
ISO 9001:2015 Quality Management System Certificate — Henan Vance Petroleum Machinery Co., Ltd.
ISO 9001:2015 Certified
Every unit is factory-tested and certified for quality and performance.
PROFESSIONAL OILFIELD EQUIPMENT

Sand Flushing Unit — Professional Oilfield Sand Cleanout Equipment

Fully self-contained, truck-mounted solution for rapid, cost-effective well sand removal.

Vance Petro sand flushing unit — left side view showing high-pressure pumping system and mobile truck chassis
High-Pressure Triplex Plunger Pump
35 MPa (5,076 psi) maximum working pressure with sustained high-flow performance.
Mobile Truck-Mounted Design
Fully road-legal, self-propelled on heavy-duty commercial chassis. Ready to deploy in hours.
Coiled Tubing Compatible
Seamlessly integrates with coiled tubing for horizontal and extended-reach wells.

Key Product Features

Powerful Diesel Engine — Cummins or equivalent, reliable in extreme conditions.
Integrated Fluid Tank System — 8–12 m³ onboard capacity for sustained operations.
Centralized Control Console — Operator-friendly panel with pressure gauges, flow meters, and emergency shutdown.
Comprehensive Safety Systems — Pop-off valves, pressure relief, grounding, and API-standard connections.
Ready to restore production?

Sand Flushing Unit — Technical Specifications

Standard configuration. Custom options available for higher pressure, different chassis, or extreme environments.

Unit TypeTruck-Mounted Sand Flushing Unit (Self-Propelled)
Pump TypeTriplex Plunger Pump (Single-Acting, Horizontal)
Maximum Working Pressure35 MPa (5,076 psi)
Maximum Flow Rate600 L/min (158.5 GPM)
Rated Horsepower250–350 HP (configurable)
EngineCummins Diesel Engine (Tier 2 / Tier 3 compliant)
Fluid Tank Capacity8 m³ – 12 m³ (2,113 – 3,170 US gallons)
Operating Temperature−20°C to +55°C (−4°F to +131°F)
Truck ChassisHeavy-duty 6×4 or 6×6 commercial chassis
Safety FeaturesPop-off valve, emergency shutdown, pressure relief, grounding system
CertificationISO 9001:2015, API Standards Compliance
Warranty12 months or 2,000 operating hours

How the Sand Flushing Unit Works

Step-by-step oilfield sand cleanout process — fast, safe, and highly effective.

1
Site Assessment & Mobilization
Review well data and mobilize the self-contained unit to the well site — ready to operate within hours.
2
Wellhead Connection & Rigging Up
Connect high-pressure lines to the wellhead and return flow line to the annulus. Pressure test all connections.
3
High-Pressure Pumping & Sand Displacement
Engage the triplex plunger pump. High-velocity fluid jet dislodges and suspends sand for circulation out of the wellbore.
4
Reverse Circulation & Sand Recovery
Sand-laden fluid returns to surface through the annulus and is directed to solids control equipment for separation.
5
Progressive Cleanout & Final Verification
Advance work string as sand is removed. Perform final high-volume flush until returns are clean. Rig down and demobilize.
Typical cleanout time: 4–12 hours per well (vs. 2–5 days with workover rig)

Applications — Where Our Sand Flushing Unit Delivers Results

🛢️
Onshore Oil & Gas Wells
Mature fields with sand production causing wellbore fill and reduced flow rates.
🪨
Shale & Horizontal Wells
Proppant flowback and sand accumulation in laterals — cleaned with coiled tubing integration.
🔧
Workover & Completion Operations
Pre-intervention cleanout before installing pumps, packers, or running new completions.
💉
Injection & Disposal Wells
Maintain injectivity by removing sand accumulation in water/gas injection wells.
🌍
Geothermal Wells
Restore thermal output by clearing mineral scale and sand in geothermal systems.
📡
Well Testing & Evaluation
Ensure accurate test data with a clean wellbore before pressure and flow measurements.

10 Reasons Operators Choose the Vance Petro Sand Flushing Unit

Rapid Mobilization
Self-contained truck-mounted unit — on site and operational in hours, not days.
60–80% Cost Savings
Dramatically lower than workover rig operations while delivering equivalent results.
35 MPa High-Pressure Performance
Handles compacted sand fills in deep wells up to 4,000+ meters.
Extreme Environment Ready
Operates reliably from −20°C to +55°C with optional winterization packages.
Coiled Tubing Compatible
Ideal for horizontal and extended-reach wells when paired with coiled tubing.
Comprehensive Safety Systems
Pop-off valves, pressure relief, emergency shutdown, and API-standard connections.

Why Choose Vance Petro as Your Sand Flushing Partner?

20+ Years of Petroleum Machinery Expertise
Specialized experience in designing and manufacturing oilfield equipment in China's petroleum capital.
ISO 9001:2015 Certified Quality
Rigorous quality management from raw material inspection to final factory acceptance testing.
Trusted in 30+ Countries
Proven performance in the Middle East, Central Asia, Africa, Southeast Asia, and South America.
Complete After-Sales Support
24/7 technical hotline, rapid spare parts supply, on-site commissioning, and operator training.

Real Results from Real Oilfields

🇮🇶 MIDDLE EAST
Mature Onshore Field — 40+ Wells Cleaned
Before
3–5 days per well • $45,000+ cost
After Vance Petro Unit
6–8 hours per well • 75% cost reduction
Deployed two units in coordinated campaign. All 40+ wells cleaned in under 8 weeks. Average production increase of 35 bbl/day per well. ROI achieved in 3 months.
"The Vance Petro sand flushing units transformed our well maintenance program."
🇰🇿 CENTRAL ASIA
Horizontal Shale Wells — Proppant Flowback Cleanout
Challenge
Horizontal laterals with 40–60% production loss from proppant flowback
Result
85–95% production restored • 30+ wells successfully treated
Custom configuration with chemical injection pump for friction reducers. Integrated seamlessly with client's coiled tubing unit. Second unit ordered within 6 months.
🇳🇬 WEST AFRICA
National Oil Company — 180+ Wells in 12 Months
Challenge
200+ well backlog • $2M/month deferred production
Result
180+ wells cleaned • 6,500+ bbl/day recovered • 92% equipment uptime
Fleet of four units delivered with winterization and tropical climate upgrades. Client ordered two additional units plus 24-month spare parts package.

Frequently Asked Questions

What is the maximum pressure and flow rate?
Standard configuration delivers 35 MPa (5,076 psi) maximum working pressure and 600 L/min (158.5 GPM) flow rate. Custom higher-pressure configurations are available.
Can it be used with coiled tubing?
Yes. Fully compatible with coiled tubing for horizontal and extended-reach wells. Optional adapter kits and chemical injection pumps available.
How long does a typical cleanout take?
4–12 hours per well depending on depth and sand volume — dramatically faster than 2–5 days with a conventional workover rig.
What is the lead time?
Standard units: 45–60 working days. Custom configurations: 60–90 working days. We provide regular progress updates with photos.
What after-sales support do you provide?
24/7 technical hotline, rapid global spare parts shipping, on-site commissioning, operator training, and preventive maintenance programs.
READY TO RESTORE PRODUCTION?

Get Your Custom Sand Flushing Solution Today

Factory-direct pricing • 48-hour response • Global support

No obligation • 24-hour response guaranteed
📞 Tel / WhatsApp
+86 189 3767 6920
📧 Email
info@vancepetro.com
🌐 Main Website
vancepetro.com

Technical resources

Plan Your Oilfield Sand Flushing Unit Project

Prepare specifications, compare equipment, define inspection requirements and plan commissioning with practical project guides.

GUIDE 01Oilfield Sand Flushing Unit Specifications and Sizing GuideGUIDE 02How to Choose an Oilfield Sand Flushing Unit ManufacturerGUIDE 03Oilfield Sand Flushing Unit RFQ Requirements ChecklistGUIDE 04Oilfield Sand Flushing Unit Installation and Commissioning GuideGUIDE 05Oilfield Sand Flushing Unit for Extreme Climates and Remote Fields
View all 10 technical guides →

Visit VancePetro.com for company and product information